How agile is the V model?
The V model has played a huge part of the evolution of developing that we see today. Legend has it that it was developed in Germany during the early 1990’s and its mission was to describe the complex ritual of what we today know as developing. The model describes needs, that gets broken down to System architecture which leads to detailed design. The steps of the V model have many names so keep that in mind if you ever talk to someone about this model. However, the fundamental principle is to create requirement(s) structure based on a need. The second and third level of the model describes that development takes place and at the bottom we so how the developed system is tested. At the “test” step we need to keep in mind what I wrote earlier; a step of the model can be called different things depending on who you talk to. Some refer to testing activities as Test, validation or verification. All three concepts are important to consider when assuring oneself about the quality of the product/system. I keep this note always in my head: